Case Studies

Some Case Studies

The creative and practical solutions provided by Xanta make its clients’ roles easier - increasing asset and technology performance, and enhancing business and technical processes.

Client: London Trams<br />Project: Authoring of LT Engineering Standards, Processes and Forms London Trams
Authoring of Engineering Standards

By: xantaadmin | Posted: 05.08.19 in: Tram |

Following the overturning of a tram at Sandilands on 9th November 2016, RAIB investigated and reported on the incident. TfL accepted recommendation 15 of RAIB Report 18/2017 v2 – October 2018. This required, among other things, “… review and, where … Read More »

Client: Tramlink Nottingham Limited<br />Project: NET Safety Assurance Review Tramlink Nottingham Limited
NET Safety Assurance Review

Tramlink Nottingham Limited (TNL), as concessionaire for NET services, manages safety in accordance with the Network Safety Management Plan. The Network Safety Management Plan defines, among other things, how hazards are identified and managed as illustrated in this extract from … Read More »

Client: London Overground<br />Project: ELR Asset Management London Overground
ELR Asset Management

Xanta assisted the East London Line division of London Overground in the implementation of their SAP-based AMIS systemwhich had reached the stage where ELR was clear that a necessary route to enabling its full and intended use entailed a restructuring … Read More »